Sui Gas Bill Calculator (2026)

Estimate your Sui gas bill in Pakistan from gas used in hm3, with protected and non-protected slabs under the OGRA notification of 29 Jun 2025. An estimate only - confirm the final amount on your bill.

Guide last updated 14 Nov 2026.

How the sui gas bill is worked out

The rates are the OGRA Gas Sale Price Notification of 29 Jun 2025, effective 1 Jul 2025, unchanged for FY 2026-27, and they are the same for SNGPL and SSGC. Gas is priced per MMBTU, but your meter reads in hm3 (100 cubic metres = 1 hm3). The tool converts hm3 to MMBTU with the GCV factor from your bill, 3.5 MMBTU per hm3 by default, and you can edit it.

Domestic consumers get the benefit of one preceding slab: use up to the previous slab boundary is charged at the previous slab rate, and only the excess is charged at the rate of the slab you landed in. Above 4 hm3 (non-protected) that benefit ends and the whole month is charged at Rs 4,200 per MMBTU. GST of 18% is added on the subtotal, which includes the energy charge, the fixed charge and the Rs 40 meter rent.

Protected slabs (Nov-Feb average up to 0.9 hm3)

Fixed charge Rs 600 a month, meter rent Rs 40 a month:

Monthly useRs per MMBTU
Up to 0.25 hm3Rs 200
Up to 0.5 hm3Rs 250
Up to 0.6 hm3Rs 300
Up to 0.9 hm3Rs 350

Non-protected slabs

Fixed charge Rs 1,500 a month up to 1.5 hm3 and Rs 3,000 a month above 1.5 hm3, meter rent Rs 40 a month:

Monthly useRs per MMBTU
Up to 0.25 hm3Rs 500
Up to 0.6 hm3Rs 850
Up to 1 hm3Rs 1,250
Up to 1.5 hm3Rs 1,450
Up to 2 hm3Rs 1,900
Up to 3 hm3Rs 3,300
Up to 4 hm3Rs 3,800
Above 4 hm3Rs 4,200 on everything

Worked example: non-protected, 1.0 hm3

At 3.5 MMBTU per hm3, 1.0 hm3 is 3.5 MMBTU. The first 0.6 hm3 (2.1 MMBTU) is charged at Rs 850 and the remaining 0.4 hm3 (1.4 MMBTU) at Rs 1,250:

ItemAmount
Energy chargeRs 3,535
Fixed chargeRs 1,500
Meter rentRs 40
SubtotalRs 5,075
GST (18%)Rs 913.5
Total billRs 5,988.5

Protected status and new connections

Protected status is set by your average use over the four winter months, November to February, not by one month. If that average is above 0.9 hm3 a month you are non-protected.

New domestic connections are given only on the RLNG tariff, not on these slabs, so this tool covers existing system-gas connections only.

Common questions

Is this tool free?

Yes. It is free and no sign-up is needed.

Is the result exact?

No, it is an estimate. Confirm official rates before a financial decision.

What is the one-preceding-slab benefit?

Use up to the previous slab boundary is charged at the previous slab rate, and only the excess is charged at the rate of the slab you landed in. Above 4 hm3 the whole month is charged at Rs 4,200 per MMBTU.

How do I know if I am protected?

Protected status is set by your average use over the four winter months (Nov-Feb), not by one month. Above 0.9 hm3 a month on average you are non-protected.

More free tools

All Kalkio tools